Connecting stubs, union nuts, housings, stems, closing elements and similar items are quoted as made-to-print component parts. SUNHY supplies those parts to the current revision. That supply is not a Pressure Equipment Directive approval of an assembly, a notified-body type examination, or a national gas-appliance approval, and it is not offered as a blanket claim. The parts remain accessories or internals, not a complete regulator, slam-shut valve, filter or station. Related scope language already appears in the notes on Relief-valve stems sourced as components, on Slam-shut valve internals sourced as components, not complete valves and on Filter closing elements sourced as components, not complete filters.

What the order is, and what it is not

The RFQ has to name the component and attach the current revision for that item number. “Quote the PED assembly” or “supply the approved station fittings” is not complete if what is wanted is a list of loose parts. A union nut and a threaded adapter that sit at the same interface remain two components, as already drawn in the note on Union nuts versus threaded adapters. Packing those two parts in one bag, or supplying a small kit of internals, is a packing arrangement when it is stated. It still does not create an approved assembly.

Seals, gaskets, springs and mating housings are supplied only if they are on the drawing or on the written order. Their presence in a shipment does not mean that SUNHY has assembled, set, or type-tested a device. If the customer wants parts shipped as a set, that requirement should be written down, including any labelling. The set is still a set of parts.

Marks, documents and tests do not change the scope

A stamped or engraved mark on a component identifies or traces the part. It is not a PED mark, a type-approval mark, or a setting mark for a complete device, as explained in the note on Marking on gas-equipment components. Certificates and any EN 10204 3.1 evidence are confirmed per order when required; they report the part and the requirements that were applied to it. They are not a declaration that a later assembly meets the Pressure Equipment Directive.

A pressure or tightness check on the component, when it is specified, remains a test of the part. It is not a type test of a regulator or a station, as in the note on Pressure or tightness checks on a component, when specified. Hardness, material and dimensional evidence follow the same boundary: they support the component print, not an unstated equipment approval.

Design responsibility stays with the customer

Wall thickness, thread form, sealing faces and materials on a made-to-print part are produced as drawn. Whether those features are suitable for a particular pressure category, fluid or assembly under the applicable equipment rules is the customer’s design responsibility. SUNHY does not offer a design-appraisal of the customer’s device, and a review of the component print for manufacturability is not that appraisal. Conflicts that are visible on the component drawing — for example a mark that resembles an approval mark, or a title block that names a complete valve — are flagged so that the customer can correct the revision or confirm that only the component is required.

Catalogue examples on this site, including SH- and SH-BR illustrations, show the kind of component that can be discussed. They are not stock assemblies, and they are not approved equipment. Brass, steel and other materials stay with each print, as in the notes on Brass connecting stubs and union nuts for gas pressure equipment and on Materials and finishes commonly specified on European gas-equipment prints.

Route, packing and first article

The manufacturing route, inspection and first-article plan, when required, are built around the component characteristics. They are not planned as a PED module or as a type-examination file. If the customer’s programme requires particular documents for the part — inspection records, IMDS, or a first-article layout — those are confirmed per order when required, as in the note on Documents that can be confirmed per order: EN 10204 3.1, PPAP and IMDS. They still describe the part.

Volume and any request to ship several item numbers together belong in the enquiry. A prototype kit assembled on the bench for a photograph is not approval of a later production packing method, and it is not approval of an assembly. Packing that protects faces, threads or bores is included when specified, as in the note on Packing, labelling and lot traceability on made-to-print shipments.

Enquiries that mix parts with equipment language

It is common for an enquiry to use equipment words — “regulator inlet”, “filter cover”, “slam-shut kit” — when the attachments are component drawings. Those words are read carefully, but they do not enlarge the scope by themselves. The attachments, the item numbers and the current revisions decide what is quoted. If the customer truly needs a complete device, that request is declined as out of scope rather than partially quoted as if a pile of internals were the device.

The same reading is used when a customer standard for approved equipment is attached beside a component print. The component can still be quoted to its own revision. The equipment standard is not treated as proof that SUNHY will carry the assembly approval, and it is not ignored either: any mark, document or test it would incorrectly place on the loose part is flagged, so that the customer can keep those requirements on the finished, approved assembly where they belong.

What to send with the RFQ

Send the current drawing revision for each item number, clearly named as a component or accessory, together with the material, finish and volume. If parts are to be packed as a set, if a particular mark must be omitted because it belongs only on an approved assembly, or if a component tightness check is already required, say so. Unspecified points, including an enquiry that only says “the PED fittings”, will be flagged before production rather than assumed.

This article is a capability and commercial note. It is not a certificate, a dimensional data book, or evidence of customer approval. Catalogue type codes and example grades do not replace the customer’s item number, material specification or drawing revision.