A pressure or tightness check on a made-to-print stem, stub, housing, closing element or other internal is not automatic. It is included only when the current drawing revision or a written order requires it, names the method, and states what is being accepted. The check is a test of the component as supplied. It is not a type test of a complete regulator, slam-shut valve, filter or station, and it does not convert the part into one of those devices. SUNHY does not manufacture those complete products. The same scope is already used for other internals in the notes on Relief-valve stems sourced as components and on Slam-shut valve internals sourced as components, not complete valves.

What has to be named before the check is quoted

A complete call-out names the medium, the pressure or vacuum, the hold time, the temperature if it matters, the surfaces or ports that are closed, and the acceptance — no visible leak, a stated pressure drop, a bubble rate, or another written criterion. It should also say whether the check is run on every part, on a sample, or only at first article. “Pressure test as usual” or “make sure it is tight” is not complete. A type code, including any SH- example used only as an illustration, does not replace that instruction.

If a special fixture, a blanking plug, a seal, or a mating piece is needed to close the part, that arrangement belongs in the agreed plan. The fixture is a means of testing the component. It is not the customer’s regulator body or station, and it is not evidence that a later assembly has been approved. Related comments on bores, seats and faces that sometimes appear in the same instruction are in the notes on Bore and passage tolerances on gas-equipment components and on Sealing faces on connecting stubs.

Hydrostatic, pneumatic and tightness methods are not interchangeable

A hydrostatic check, a pneumatic tightness check, a vacuum decay, or a bubble test in water are different methods. They place different demands on the part, the fixture and the residual medium left in a passage. The method is taken from the print or agreed in writing. A shop habit of “dunking it to see if it bubbles” is not a substitute for a named method, and a prototype checked by one method does not by itself approve a later production method if the pressure, the medium or the acceptance will change.

After a wet test, any drying, cleanliness or corrosion-protection step required to return the part to the specified condition is part of the route, as already discussed for washing and packing in the notes on Cleanliness and washing before coating or assembly and on Packing, labelling and lot traceability on made-to-print shipments. A residue that narrows a bore, stains a sealing face, or conflicts with a cleanliness note is reviewed rather than left as an unplanned side-effect of the test.

What the check does not claim

A passed component check is not a flow rating, a set-pressure confirmation, a slam-shut performance result, or a PED or type-approval of an assembly. It does not stand in for the customer’s type test of a regulator, filter or station. If the enquiry actually asks for those complete-device results, that work is outside the scope of this site and is not quoted as an assembly approval. Accessories packed together still remain parts, as in the note on Accessories and component parts are not a PED assembly.

Marks, certificates and any EN 10204 3.1 evidence of the check are confirmed per order when required. A stamp on the part is not a setting mark or an approval mark for a complete valve, as already stated in the note on Marking on gas-equipment components. IMDS or other substance data, when requested, remain a separate document.

Route, first article and volume

When the check is in scope, it is planned on the production-intent route: the same machining, coating and cleanliness state in which series parts will be tested, unless the order states a different stage. A hand-sealed prototype that was closed with tape or a shop plug does not by itself approve a later production fixture if the sealing of the test ports will change. First-article inspection, when required, should report the check as it will be performed in series, as in the note on First-article inspection on made-to-print parts.

Volume belongs in the enquiry because a 100% check, a sampled check, and a first-article-only check are different commercial and technical plans. A change of method, fixture or acceptance after samples have been approved is a process change and is reviewed before serial use. Filter closing elements and other internals follow the same rule: the part is tested as a part, as in the note on Filter closing elements sourced as components, not complete filters.

Conflicts and incomplete enquiries

A print that names a test pressure the remaining wall cannot reasonably support, or that asks for a tightness result on a passage that is still open by design, is flagged. A title-block note that calls the article a “valve” and a view that shows only a stem are read as a component enquiry; they are not taken as a request to type-test a complete device. Those conflicts are resolved on the revision or in a written order comment, not by improvising a test on the bench to make the part look approved.

What to send with the RFQ

Send the current drawing revision, together with the material, finish and volume. If a pressure or tightness check is already required, include the method, the acceptance and the sampling. If a particular fixture, a cleanliness recovery after the test, or a first-article record of the check is already required, say so. Do not send only a request to “pressure-test the regulator”. Unspecified points will be flagged before production rather than assumed.

This article is a capability and commercial note. It is not a certificate, a dimensional data book, or evidence of customer approval. Catalogue type codes and example grades do not replace the customer’s item number, material specification or drawing revision.