A made-to-print quotation should be as careful about documents as it is about geometry. Buyers are right to ask for material evidence, inspection records, PPAP or IMDS. Suppliers are right not to imply that those documents are already in place for every part, every site and every legal entity, or that a quality-system certificate is a substitute for the evidence the order actually needs.

This article states how SUNHY treats documents for automotive fasteners and for gas-equipment components. The short version is the same in both catalogues: evidence is confirmed for the order, not assumed. Nothing on this site is a blanket certificate, an approval, a stock commitment or a guaranteed PPM result.

What can typically be requested

The current drawing revision is agreed with the order and remains the controlling document. Material and finish are taken as specified. The following can be requested and are then confirmed with the order scope:

  • EN 10204 3.1 mill test certificates
  • Dimensional and inspection records, as agreed
  • PPAP, when the project requires it, at the level and with the evidence named in the quotation
  • IMDS entry, when the project requires it, with the scope stated in the quotation

Dimensional checks, material identification and any additional tests — hardness, proof load, torque, coating or cleanliness — are carried out as specified for the part. The inspection plan is written against the print and the order, not assumed from a general catalogue statement. Methods listed on the quality page are capabilities that can be included; they are not applied automatically to every family.

EN 10204 3.1 is confirmed per order

An EN 10204 3.1 inspection document can be supplied on request. It is confirmed with the order scope: the legal entity, the manufacturing site, the material and the part it covers. It is not a standing attachment to every quotation, and it is not a product approval. If the drawing or the specification calls up a different document type, that requirement is reviewed rather than substituted.

PPAP and IMDS are not automatic

PPAP submission and IMDS entry are reviewed for the particular part. The level, the required evidence, and whether IMDS entry is included are stated in the quotation. They are not an automatic or already-certified capability on every item, and they are not assumed as a standard inclusion on every automotive or gas-equipment order. When a project requires them, they should be named in the RFQ so that the quotation can address them explicitly. See what to include in a made-to-print RFQ.

Quality-system certificates are not a blanket mark

Quality-system certificates, third-party reports and product approvals are referenced in a quotation only after the legal entity, manufacturing site, product scope and validity have been confirmed for that order. ISO 9001 may be referenced as a quality-system framework on the same basis. A quality-system certificate is not a substitute for a customer-required automotive quality-management scheme, and it is not presented on this site as product approval or as IATF 16949 certification.

Orders may reference EN, PED or other specified standards. Those names identify the requirement on the drawing or in the specification, not a blanket company mark, and not a claim that SUNHY manufactures complete regulators, slam-shut valves, filters or stations.

Optical sorting and PPM figures, where they arise

On fastener programmes, optical sorting can be applied to a part family when the enquiry calls for it and a sorting plan is agreed. Programme targets such as below 50 PPM or 0-PPM may be discussed. Those figures are targets, not guarantees, and they do not mean that every part family is 100% sorted. They have no place as an implied promise on a gas-equipment housing or internal unless the same kind of plan has been agreed for that part.

How this appears in a quotation

The quotation states the proposed process route, the inspection and document package, tooling implications, and the commercial terms. Where the drawing is incomplete on thread class, coating, gauging or documents, those points are listed as open items. Production does not begin on an assumed interpretation. Enquiries are handled in English. Shipments can be planned under FOB, CIF or DDP terms; the applicable term and its scope are confirmed in the offer.

This approach applies equally to weld nuts, special nuts, bolts and studs, and to gas-equipment accessories such as diaphragm housings and slam-shut internals. Send the print with the request form or to anna@sunhyings.com.

This article is a capability and commercial note. It is not a certificate, a dimensional data book, or evidence of customer approval. Catalogue type codes and example grades do not replace the customer’s item number, material specification or drawing revision.