Washing, degreasing and other cleanliness steps often stand between heading or machining and a coating line, and again between a finished part and an assembly or a packing step. On a made-to-print order those steps belong in the agreed route when they are required, either by the print, by a referenced cleanliness specification, or by the coating and assembly process that has been stated. They are not assumed from a general note that the part should be “clean and dry”, and they are not left as an informal rinse that disappears from the documented sequence.
What has to be visible on the revision or in the enquiry
If a cleanliness specification, a residue limit, a particle requirement, or a ban on particular oils or silicones applies, it should be named on the revision or attached to the enquiry. “Wash before plate” or “no oil” without a method or a limit is an open item if the customer intends it as a controlled characteristic. Temporary protective oils used in transit, and specified lubricants that must remain on the delivered part, are different instructions and must not be confused, as in the note on lubrication, dry-film and friction modifiers.
Cleanliness also supports coating adhesion and appearance. A washing step that is needed so that a named system will take uniformly is a process step and is stated; it does not replace the coating specification itself. Related coating inspection is discussed in the note on appearance, adhesion and coating inspection.
The step is part of the documented route
Aqueous washing, solvent degreasing, mechanical cleaning or an acid or alkaline clean can leave different residues and different surfaces for the next operation. The method, the position in the sequence, and any drying or rust-preventive step that follows are part of the agreed route and are stated rather than assumed. A sample that was carefully hand-cleaned in a laboratory is not automatic approval of a later bulk-wash route when the print or the coating specification sets a residue limit. A change of cleaner, or a move of the wash in the sequence, is a process change and is re-validated before serial release, as in the notes on secondary operations and on prototype samples and series production.
Inspection is used when specified
Residue, water-break, particle, or a simple visual cleanliness check are used when the print or the order requires that evidence, not automatically in every possible form. If a particular method, a first-article cleanliness record, or a ban on a named contaminant is already decided, name it. A visual check that “the parts look dry” is not a substitute for a residue limit that is written on the specification. Certificates and any EN 10204 3.1 evidence are confirmed per order when required.
Open items and conflicts
A print that requires a specified assembly lubricant and also a “zero residue” cleanliness grade, or that bans all oils and still asks for a temporary transit protection, is flagged. Those conflicts are resolved on the revision or in the agreed route, not by an informal wipe at packing. Cleanliness requirements that apply only before coating, and those that apply to the delivered part, should be distinguished.
Cleanliness, rust prevention and packing have to be consistent
A part that has been washed to a tight residue limit can rust or pick up packing contamination before it is coated or assembled if the next step is not also agreed. Rust-preventive films, drying, and the packing materials used between operations belong in the route when cleanliness is a controlled characteristic. They are not improvised with a convenient oil after a wash has been signed off. Related packing notes are already collected in the article on packing, labelling and lot traceability.
Volume and the proposed washing route also belong in the enquiry. A hand-washed prototype is not automatic approval of a later bulk-wash line, and a change of cleaner, of temperature, or of drying after samples have been approved is a process change. First-article inspection, when required, should be planned on the production-intent cleanliness route, as in the note on first-article inspection. The current drawing revision remains the source of any cleanliness requirement in every case.
The enquiry should also distinguish shop-clean conditions needed only so that a coating will take, from cleanliness grades that apply to the delivered part, from any clean-assembly requirement at the customer. Those three are not the same instruction. If a particular residue method, a particle size, or a ban on silicones is already decided, name it. A change of washing contractor, or a change from an in-house wash to an outsourced one after samples have been approved, is a process change when cleanliness is a controlled characteristic, and it is re-validated before serial release.
Packing materials themselves can add residue, fibres or rust after a successful wash. If cleanliness is a controlled characteristic of the delivered part, packing belongs in the same plan, as in the note on packing, labelling and lot traceability. A clean laboratory sample packed in an unagreed paper or oil-film bag is not automatic approval of the series pack.
What to send with the RFQ
Send the current drawing revision, the coating or assembly specification, and any cleanliness or residue standard already chosen. If a particular washing method, a first-article check, or a restriction on oils and silicones is already decided, name it. Volume belongs in the enquiry because washing routes can depend on it. Unspecified points will be flagged before production rather than assumed.
This article is a capability and commercial note. It is not a certificate, a dimensional data book, or evidence of customer approval. Catalogue type codes and example grades do not replace the customer’s item number, material specification or drawing revision.