Zinc-flake systems appear on many automotive fastener prints, sometimes under a generic description and sometimes under a named trade system such as Geomet or Dacromet. On a made-to-print order the system is reviewed only as the current revision calls it up. A trade name is not interchangeable with a generic flake description, and one named system is not substituted for another just because both are silver, both are chromium-free, or both are familiar in the same industry. The quotation follows the named specification, not a preferred shop system.
What has to be visible on the revision
A complete call-out names the system or the customer specification, the number of coats or the applied thickness if that is how the specification works, any topcoat or lubricant, and the required appearance or friction condition. “Flake coat, silver” or “Geomet or equivalent” without a named equivalent on the print is not complete. If a customer standard already lists approved systems, it should be named on the revision or attached to the enquiry. Equivalence is not assumed in the workshop.
Thread class, reserved allowance and post-coat gauging have to be consistent with the flake build, as in the note on coating thickness and thread class. Friction and torque-tension, when they are specified, stay with the finish, as in the note on friction class and torque-tension. Relief of hydrogen embrittlement, where it is relevant to a high-strength part and a particular process, remains a separate requirement and is not restated here; see the existing note on coatings for high-strength fasteners.
The name is part of the process, not a colour
Application method, curing, topcoat and lubricant packages differ between systems, even when the finished colour looks similar. A sample coated in one named system is not approval of a later route in another named system, or in a generic flake, when the print names a system. A change of system, of topcoat, or of a friction modifier after samples have been approved is a process change and is re-validated before serial release. Colour alone does not identify the system; that point is taken further in the note that colour is not the coating system.
Inspection follows the named specification
Thickness or coat-weight checks, appearance, adhesion, friction, or a salt-spray requirement are used when the print or the order requires that evidence, not automatically in every possible form. If a particular method, a first-article coated layout, or a customer approval of a named system is already decided, name it. A photograph of a silver flake finish is not evidence that the named system was applied. Certificates and any EN 10204 3.1 evidence are confirmed per order when required. Neutral salt-spray hours, when they appear, follow the specification and are not published here as a site result.
Open items and conflicts
A print that names two trade systems as if they were interchangeable, or that mixes a named system in the title block with a different generic flake in a note, is flagged. An IMDS entry, when required, has to follow the system that is actually applied, as in the note on IMDS entries and the material grade.
Application route is part of the named system
Dip-spin, spray or another agreed application method, the number of coats, and the cure are process decisions inside the named specification. They are stated rather than assumed. A hand-sprayed laboratory sample is not automatic approval of a later dip-spin series route when the print names a system and a thickness or coat-weight window. Recesses, internal threads and contact faces can hold excess flake; those zones are reviewed against the print, including any requirement to gauge after coating, as in the note on coating on internal threads.
Volume and the proposed application route also belong in the enquiry. A change of named system, of topcoat, or of application method after samples have been approved is a process change and is re-validated before serial release. First-article inspection, when required, should be planned on the production-intent coating route, as in the note on first-article inspection. The current drawing revision remains the source of the flake-system requirement in every case.
The enquiry should also attach any customer approval list, data sheet reference, or friction-class table that already names the acceptable flake systems and topcoats. Those documents are reviewed with the current revision; a data sheet alone is not a substitute for the print. If the part is high-strength, any additional process requirements that belong with that class remain as specified in the existing coating article and are not replaced by the trade name. A first-article coated layout, when required, should show the production-intent number of coats, the topcoat and the gauge condition, not only a silver appearance on a laboratory piece.
Storage and handling of coated parts can scuff a flake film or a topcoat. If the specification limits handling marks, packing and in-process handling belong in the agreed route, as in the note on packing, labelling and lot traceability. A scuffed laboratory sample is not tidied into approval of a later series pack.
What to send with the RFQ
Send the current drawing revision, the coating specification or the named trade system, and any customer list of approved flake systems. If a topcoat, a lubricant, a friction class or post-coat gauging is already required, say so. Volume belongs in the enquiry because application routes can depend on it. Unspecified points will be flagged before production rather than assumed.
This article is a capability and commercial note. It is not a certificate, a dimensional data book, or evidence of customer approval. Catalogue type codes and example grades do not replace the customer’s item number, material specification or drawing revision.