Some made-to-print drawings and referenced specifications do more than describe the metal part. They name a cleanliness condition, a residual-oil limit, a washing method, a VCI or desiccant pack, caps or trays that protect a face or a thread, a bag type, or a labelling and lot-marking rule. When those notes are on the print or on the written order, they are production requirements. They are planned in the route and inspected as specified. They are not left as afterthoughts at despatch. Ordinary packing and lot traceability, and washing before coating or assembly, are already introduced in the notes on Packing, labelling and lot traceability on made-to-print shipments and on Cleanliness and washing before coating or assembly.
What has to be visible in the requirement
A complete instruction names the cleanliness or residue limit, the method used to achieve and to check it, the packing materials, the protection of particular features, and the labels or documents that travel with the lot. If a cleanliness specification is cited, it should be attached or clearly identified, including its revision, as other stacked specifications are in the note on Specification stack and order of precedence. “Clean and pack well” is not complete.
Protection of a sealing face, a gland, a thread or a fine diameter belongs with the feature it is intended to protect, as in the notes on Sealing faces on connecting stubs and on O-ring grooves and seal glands on component parts. Caps, trays or films that can shed particles or stain a face are reviewed against the same cleanliness note, not chosen only for convenience.
Cleanliness is produced, not only declared
Washing, rinsing, drying and handling after the last machining or coating step have to be capable of meeting the stated limit. A change of washing chemistry, of a washing source, or of the packing material is a process change when it can affect the result, consistent with the source-change rule in the note on A change of subcontractor is a process change. A prototype wiped by hand on the bench does not by itself approve a later production wash if the residue or the dryness will change.
If a tightness or pressure check is also specified, any recovery of cleanliness after that test is part of the route, as in the note on Pressure or tightness checks on a component, when specified. Residual test medium in a passage is not left as an unplanned exception.
Labels, marks and documents
A bag or carton label does not replace a mark that the print requires on the part, and a mark on the part does not replace a lot label that the order requires on the packing, as already distinguished in the note on Marking on gas-equipment components. Certificates and any EN 10204 3.1 evidence, and packing lists, travel as agreed and remain confirmed per order when required, as in the note on Documents that can be confirmed per order: EN 10204 3.1, PPAP and IMDS.
First article, conflicts and volume
First-article inspection, when required, should include the cleanliness or packing condition that will be used in series if that condition is a specified characteristic, as in the note on First-article inspection on made-to-print parts. A print that names a cleanliness limit a proposed packing film cannot support, or that requires a cap that will not fit the finished outline, is flagged. Volume belongs in the enquiry because dedicated trays, dry packs or 100% cleanliness checks are not always the same plan as a short prototype shipment.
Handling after the wash, and opening the pack
A cleanliness limit is easily lost between the washer and the closed pack: bare hands, dirty trays, compressed air that blows chips back into a bore, or a cap fitted on an unwashed thread. The route should cover that interval, including any clean gloves, covered containers, or limited open time that the specification requires. Inspection of cleanliness, when it is specified, is done at the stage that the specification names — often in the packed condition — not only at the washer exit.
How the customer will open and use the pack also matters when the print is specific. A VCI bag that must remain sealed until the line, a lot label that must remain readable after opening, or a cap that must be retained for return of unused parts is part of the requirement if it is written. Those points are not invented as a service, and they are not ignored when they are on the sheet. They are planned with the same seriousness as a tolerance.
Reusable trays or returned caps, when the specification allows them, have their own cleanliness and identification rules. A returned pack that re-enters the line without a defined clean step is a route hole. If reusable packing is not in the specification, it is not assumed as a cost-saving substitute for the stated disposable pack.
What to send with the RFQ
Send the current drawing revision, any cleanliness or packing specification, and the material, finish and volume. If VCI, caps, a residual-oil limit, a labelling rule, or a first-article check of the packed condition is already required, say so. Unspecified points will be flagged before production rather than assumed.
This article is a capability and commercial note. It is not a certificate, a dimensional data book, or evidence of customer approval. Catalogue type codes and example grades do not replace the customer’s item number, material specification or drawing revision.