A ballooned drawing and a layout inspection give a characteristic-by-characteristic record against the current revision. On a made-to-print order that work is included when the customer requires it, typically at first article, after a process change, or at a stated frequency. It is not a hidden default on every lot, and it is not a substitute for the in-process or final inspection plan that the order otherwise agrees. The authority remains the current 2D revision, as discussed in the notes on Drawing revision control on made-to-print orders and on The 3D model versus the 2D drawing.

What a complete layout request looks like

A complete request says who prepares the ballooned drawing — the customer or the supplier — which revision is ballooned, how characteristics are numbered, and which items are included: dimensions, geometric tolerances, notes, material and finish call-outs, and any test. If only a subset is required, that subset should be named. “Full layout as usual” is not complete. Reference or auxiliary dimensions are not treated as inspected characteristics by default, as in the note on Reference dimensions versus inspected characteristics.

The report should use the same characteristic numbers as the ballooned drawing, record the method and the result, and identify the pieces that were measured. Measurement methods and any required gauge agreement follow the note on Measurement system and gauge agreement. Geometric tolerances are reported against the stated datums, as in the note on Datums and geometric tolerances on turned parts.

First article, frequency and process changes

When the layout is tied to first-article inspection, it should be planned on the production-intent route, not only on a hand-finished prototype, as already required in the note on First-article inspection on made-to-print parts. A later process change — a new heading die, a new coating source, a new machining setup — may require a new layout when the customer plan says so. The frequency for serial layouts, if any, is stated; it is not assumed to be “every lot” or “never” in the absence of a requirement.

Sampling of ordinary lots and a periodic layout are different activities. A passed AQL check does not replace a layout that is due, and a layout of a few pieces does not replace the agreed lot inspection, as in the note on Sampling plans are agreed, not assumed.

What the layout does not claim

A completed layout is a record of the pieces that were measured, at the revision that was ballooned. It is not a type test of a complete regulator or station, not a PED approval, and not a licence to use a different revision on the next lot. Certificates and any EN 10204 3.1 or PPAP evidence are confirmed per order when required, as in the note on Documents that can be confirmed per order: EN 10204 3.1, PPAP and IMDS, and may include the layout when that is the agreed package. They still describe the part.

If several item numbers belong to a family, each item that requires a layout should be ballooned from its own current revision. Similarity is not a licence to reuse another item’s report, as in the note on Quoting a family of similar parts.

Conflicts, incomplete balloons and volume

A balloon set that misses a titled note, that numbers the same characteristic twice, or that conflicts with a later revision is flagged. The layout is not used to overwrite the drawing. Conflicts between a ballooned value and a CAD model are resolved in favour of the agreed authority, usually the 2D revision, as in the note on The 3D model versus the 2D drawing. Volume belongs in the enquiry because a full layout of a complex housing is a different plan from a short dimensional list on a standard headed fastener.

Units, notes and photographs in the report

Layouts fail as often on presentation as on metal. Mixed millimetres and inches, a missing note that was ballooned, a result recorded without the method, or a photograph of the wrong revision will make a technically good part look incomplete. The report should state the revision, the date, the piece identification, and any deviation from the planned method. If a characteristic cannot be reached without a section or a special fixture, that limitation is written down rather than skipped without comment.

A customer template is used when it is supplied and is compatible with the balloon set. If the template asks for a result the method cannot produce — a variable value on a pure go / no-go thread, or a capability index at first article on a five-piece layout — the conflict is flagged before the report is issued. The layout remains a record of what was measured, not a document that invents a number to fill a cell.

When a characteristic is accepted by a calculation from several measured values, the report should show those values and the calculation, not only the final number, so that the layout can be retraced.

What to send with the RFQ

Send the current drawing revision, any already ballooned drawing or characteristic list, and the material, finish and volume. If a first-article layout, a periodic layout, or a particular report format is already required, say so. Unspecified points will be flagged before production rather than assumed.

This article is a capability and commercial note. It is not a certificate, a dimensional data book, or evidence of customer approval. Catalogue type codes and example grades do not replace the customer’s item number, material specification or drawing revision.