On a headed fastener, the dies and related tools are part of the process, not a disposable convenience. They carry the head, the under-head, often the shank, and sometimes a portion of the thread-form preparation. A new die, a resink, a different tool set, or a move from a machined prototype to a headed series route is a process change. It is reviewed and re-validated before serial release, not introduced quietly because a tool wore out.

SUNHY uses cold heading, where it is suitable, typically inside the M4–M24 window described on this site, for bolts, screws and studs, weld nuts and some special nuts. The note on cold heading versus CNC explains how the route is chosen. This note is about the tools themselves and about what a tool change means for the customer.

Tools are built to the print, not to a similar part

Heading dies, punches, trims and thread-rolling dies, where they are used, are produced against the current drawing revision and the agreed route. A tool that already exists for a similar hex, a similar projection or a similar thread is not reused as a shortcut if the print differs. Even a small change to an under-head radius, a flange, a weld projection or a drive can require a new tool or a controlled modification.

If the customer later changes the revision, the tools are reviewed against the new print. Some changes can be absorbed; others cannot. That review is part of revision control, as described in the note on drawing revision control, not an informal filing of a new PDF.

Wear, replacement and a resink

Tools wear. Replacement with a tool built to the same design is still a controlled event: the first pieces from the new or resunk tool are checked against the print and against the agreed inspection plan. If the customer requires a layout, a capability check, or a notification when a heading die is replaced, that requirement belongs in the order. It is not assumed, and it is not omitted if it has been agreed.

A wear-related change that quietly alters a radius, a projection height or a head height to “get more life from the die” is not acceptable. The print remains the authority. If a geometry change is proposed, it is proposed as a drawing change or as a written deviation, not as a tool-room adjustment.

A change of route is also a tool change

Moving from a machined sample to a headed series part introduces a new tool family and a new process condition. The sample does not approve the headed part. First-article or layout inspection, when required, should be planned on the production-intent tools. The same applies if a headed route is later changed to CNC, or if a secondary machining operation is added or removed. See from prototype samples to series production.

Thread-rolling dies are process tools in the same sense. A change from a rolled to a cut thread, or the reverse, is a process change, as set out in the note on rolled versus cut threads, and it is not made only because a rolling die is unavailable.

Ownership, storage and transfer

Who owns the heading dies, fixtures or gauges, who pays for their upkeep, and how they are stored or transferred if a programme moves, are commercial terms. They are agreed in writing when they matter. This site does not state a default ownership rule, and a quotation should not be read as transferring ownership unless that term is written.

Capability data and first-article reports are tied to a process condition that includes the tools. They do not automatically cover a new die set. If a new study is required after a tool change, that should be stated in the programme documents — see process capability on drawing-controlled characteristics.

What is agreed about time and cost, and what is not published

The time needed to design, cut and prove a heading die, and the commercial treatment of that work, are confirmed for the enquiry. They are not published as a standard lead time or a standard tool charge on this site, and a figure used on a previous item is not reused automatically. If a programme needs a stated date for tool readiness, or a rule for the payment and ownership of dies, that belongs in the RFQ and in the quotation, not in an assumed custom.

Capacity on a heading machine is also not a published site number. A route is proposed against the volume on the enquiry; a later increase, a family of similar parts, or a transfer of tools from another source is a new review. Existing dies, even if they look close, are not committed to a new item number until the print has been compared and the change, if any, has been agreed. The quotation will say what tools are to be made or adapted, rather than leave that point implicit.

What to write in the RFQ

Send the current revision and, if you already have rules for tool changes, first-article after a resink, or tooling ownership, include them. State the volume, because volume is part of the route and tool decision, together with material, finish and the documents you need. Use the request form or email anna@sunhyings.com. A wider list of enquiry items is in what to include in a made-to-print RFQ.

This article is a capability and commercial note. It is not a certificate, a dimensional data book, or evidence of customer approval. Catalogue type codes and example grades do not replace the customer’s item number, material specification or drawing revision.