Optical, eddy-current, laser or other automated sorting is used on made-to-print fasteners and small components when the order requires it. It is a planned operation with named features, equipment and a set-up standard. It is not an automatic feature of every lot, it is not a PPM guarantee, and it does not replace the drawing. Parts still have to meet the current revision. Sorting only decides, for the features it has been set to see, whether a piece is accepted, rejected or diverted.
What has to be named
A complete request names the features to be sorted — presence of a point, a washer, a recess, a mark, a gross diameter, a length, a crack indication, or another written feature — the equipment family, and the reaction to a reject. If a golden sample or a boundary sample set is required, it should be identified and controlled. “100% automatic sort as usual” is not complete. The sort is typically an attribute decision, as discussed in the note on Attribute versus variable inspection.
Set-up and any required agreement of the system with a reference method belong in the plan, in the same spirit as other measurement-system points in the note on Measurement system and gauge agreement. A system that only sees the silhouette of a head is not evidence of a thread class, a roughness, or a hardness that the print still requires to be inspected in another way.
What sorting does not replace
Sorting does not replace first-article or layout inspection when those are required, as in the notes on First-article inspection on made-to-print parts and on Ballooned drawings and layout inspection. It does not replace a sampling or 100% plan for characteristics the machine is not set to see, as in the note on Sampling plans are agreed, not assumed. It does not replace process control of the heading or machining route, and it is not a process-capability result, as in the note on Process capability on drawing characteristics.
A mark that is used as a sort feature still has to be the mark the drawing requires, as in the note on Marking on gas-equipment components. Sorting on a convenient but unofficial mark is not assumed. Packing after a sort has to preserve lot identity and must not mix rejected and accepted pieces, as in the note on Packing, labelling and lot traceability on made-to-print shipments.
Route, samples and volume
The sorting step, when it is in scope, is part of the agreed route. A change of machine, of camera set-up, or of the feature set after samples have been approved is a process change. A handful of prototypes sorted by hand on a bench does not by itself approve a later automated machine if the features or the lighting will change. Volume belongs in the enquiry because tooling, programming and sample masters are not always justified for a very short lot.
Conflicts and open items
A request for a very low PPM target together with a sort that can only see a few gross features is flagged. So is a print that requires a characteristic the proposed machine cannot detect. Those conflicts are resolved in writing. Sorting is a tool for the characteristics it can honestly see; it is not a claim that the lot is free of every possible departure from the print.
Masters, lighting and false decisions
Automated sorting is only as stable as its masters and its environment. Lighting, dust, oil, mixed orientations and worn tooling marks can create false rejects or, worse, false accepts. Boundary samples should be kept identified and should be reviewed when the revision, the coating or the tool mark changes. A master taken from a first prototype lot is not automatically valid after a heading-die change or after a new coating shade.
The daily set-up should include a challenge of the machine with known good and known bad pieces, at a frequency that is agreed. If the machine cannot be challenged on a feature, that feature is not claimed as sorted. Results — accept, reject, and diversion counts — belong in the lot record when the order requires evidence of the sort. Those counts are process information; they are not a published PPM performance of the site.
Orientation of the part in the bowl, on the rail, or in the nest has to be stable enough for the camera or the sensor to see the feature it is claimed to sort. A feature hidden under a flange or lying in a recess may need a second station or a mechanical turnover; if that station is not in the route, the feature is not claimed. Mixed item numbers in one hopper are not assumed, even in a family, because a sister length can look acceptable to a machine set for another item and still be the wrong part.
What to send with the RFQ
Send the current drawing revision, the material, finish and volume, and any already required sorting specification, feature list or sample-master requirement. If sorting must be 100% on named features, or must not be used as a substitute for a measured layout, say so. Unspecified points will be flagged before production rather than assumed.
This article is a capability and commercial note. It is not a certificate, a dimensional data book, or evidence of customer approval. Catalogue type codes and example grades do not replace the customer’s item number, material specification or drawing revision.